Technical Blog and Highlights

APR Inspection HX tubes in China_1

APRIS Inspection on HX tubes in China

DATE OF INSPECTION: 24 July 2021LOCATION: Guangzhou, China TOTAL NO. OF TUBES: 1,452CONFIGURATION OF TUBES: StraightTUBE OUTER DIAMETER: 19mmTUBE THICKNESS: 2mmTUBE LENGTH: 9m THE CHALLENGE The client had a short…
Inspection of DePropanizer Reboiler Tubes_3

Inspection of DePropanizer Reboiler Tubes

INTRODUCTION & PROBLEM STATEMENT Trinidad is the leading exporter of oil & gas on a global scale. A major natural gas processing and fractionating company were facing challenges on their…
Inspection of Vaporizers in Regasification_3

Inspection of Vaporizers in Regasification

INTRODUCTION The outlook of LNG is evolving day to day. A lot of LNG terminals are heading towards miniaturization due to myriad methods of regasification methods. Various processes are involved,…
Inspection of Cooler Tubes in a Mining Plant_1

Inspection of Cooler Tubes in a Mining Plant

INTRODUCTION Mining is the economic foundation of many countries. In mining/mineral processing, industrial equipment is often jacketed (sleeved) with flowing water to cool fluids and absorb process heat. This equipment…
APR Inspection on Utube_1

APRIS Inspection on Utube

DATE OF INSPECTION: 11 Sept 2019 LOCATION: Italy TOTAL NO. OF TUBES INSPECTED: 4 CONFIGURATION: U-tube TUBE OUTER DIAMETER: 25.4mm TUBE THICKNESS: 2.771mm TUBE LENGTH: 12.6m THE CHALLENGE The client…
APR Inspection on Condenser_3

APRIS Inspection on Condenser

DATE OF INSPECTION: 4-8 Oct 2019 LOCATION: Malaysia Power Plant TOTAL NO. OF TUBES INSPECTED: 11,264 CONFIGURATION: Straight Tube TUBE OUTER DIAMETER: 25.4mm TUBE THICKNESS: 0.711mm TUBE LENGTH: 8.256m THE…